Enerpac ER-1 Hoja De Instrucciones página 4

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 17
OPERATION
Moving the Load
Turning Corners
Trouble
1. Clean the track surface. If the track surface is not even and clean, the chain may
become blocked.
2. Move the load by pushing or pulling the load steadily. Avoid jerking the load. Do
not push or pull with the handles.
WARNING
If a roller skate jams, stop movement immediately.
Do not exceed the maximum speed of 39 in/min [5 m/min].
Allow for a backstop to prevent the load from rolling back on ascending or descending
gradients.
Use turntables to guide the load while roller skate is moving. The minimum turning
circle is 10 ft. [3 m].
Do not turn corners by force.
To turn a corner without a turntable (swivel):
1. Lift the load.
2. Make sure that the load is completely and safely supported.
3. Align roller skates with the new direction of movement.
4. Lower the load onto the roller skates, making sure that the load rests completely and
uniformly on the roller skates.
If the roller chain of one or several roller skates is blocked by obstacles, gently push
back the load and remove the obstacle.
If a roller skate is twisted under the load by obstacles, unevenness of the track surface or
other problem, follow the instructions below:
1. Lift the load.
2. Make sure the load is completely and safely supported.
3. Remove the obstacle and align the roller skates with the direction of movement.
4. Lower the load onto the roller skates, making sure the that the load rests completely
and uniformly on the roller skates.
4

Publicidad

Tabla de contenido
loading

Tabla de contenido