SPC-10-...
6
Instructions for operation
CAUTION:
To avoid damage by moving into fixed stops without
cushioning:
- Carry out commissioning again after modifying the fixed
stops, adjusting the DIL switches or replacing components
- use only the permitted mass load.
Control the slide as indicated in the following table
Input/output
Description
Output A
Supplies a 1-signal when slide is in end position A
(potentiometer connection)
Output B
Supplies a 1-signal when slide is in end position B
(opposite potentiometer connection)
Input B
1-Signal (min. 20 ms) sends command to move to B
(if there is an 0-signal at input A)
Input A
1-Signal (min. 20 ms) sends command to move to A
(if there is an 0-signal at input B)
Change of direction is possible at any time during positioning.
The
positioning
approximately 10 to 20 strokes (adaption). Optimize the
positioning behaviour as follows:
•
Check the system structure; compressed air reservoir during
fluctuations in pressure; modify the supply pressure
•
Modify the DIL switch setting accordingly
•
If necessary, fit restrictors in the exhaust tubing of the
MPYE-5-... in order to reduce the speed.
18
behaviour
improves
automatically
after
9902c