Introduction; Transportation; Handling; Inspection - Parker PSE1400 Manual De Uso

Ocultar thumbs Ver también para PSE1400:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

English

2 Introduction

This manual is in reference to Parker PSE1400-6000 refrigeration dryers
designed to remove water vapor from compressed air.

2.1 Transportation

The packed unit must:
• remain upright;
• be protected against atmospheric agents;
• be protected against impacts.

2.2 Handling

Use a properly suited fork-lift truck for lifting. Avoid any type of impact
when handling the dryer.

2.3 Inspection

a) All the units are assembled, wired, charged with refrigerant and oil
and tested under standard operating conditions in the factory;
b) on receiving the machine check its condition: immediately notify the
transport company in case of any damage;
c) To avoid unnecessary handling of the dryer, unpackage the unit as
close as possible to the place of installation.

2.4 Storage

If stacking is required, follow the instructions stated on the packaging.
Keep the unit packaged in a clean, dry area that is protected from the
elements, direct sunlight and/or other harsh conditions.

3 Installation

Y
Only competent personnel trained, qualifi ed, and approved by
Parker should perform installation, commissioning, service and repair
procedures. Use caution when near the dryer and wear the proper pro-
tective equipment.
!
If installed in a place with fi re hazard, provide a suitable fi re-extin-
guishing system. The installed product must be protected against fi re
risk(Ref. EN378-3)

3.1 Procedures

Install indoors in a clean, dry area that is protected from the elements,
direct sunlight and/or other harsh conditions.
Y
Comply with the instructions given in par. 8.2 and 8.3.
For reliable operation and warranty purposes, proper pre-fi ltration is rec-
ommended. Without a pre-fi ltration the dryer may see degradation in
performance and/or permanent dryer failure. Warranty will be voided if
the inlet air quality does not meet the required ISO8573-1 Class for par-
ticulate and total oil. Seller is excluded from any obligation of compensa-
tion or refund for and direct or indirect damage caused by its absence.
Y
Pre-fi lter element must be replaced at least once a year, or sooner
as per manufacturer recommendations.
Y
Correctly connect the dryer to the compressed air inlet/outlet con-
nections using pipe or hose that meets the temperature and pressure
PSE 1400-6000 60Hz
requirements of the air compressor output. (see par.8.3 and 8.6).

3.2 Operating space

Leave a space of 5ft (1.5 m) around the unit.
Leave a space of 6,5ft (2 m) above dryer models with vertical condensa-
tion air expulsion.

3.3 Condenser Types

Air-cooled version (Ac)
Standard condenser type for all PSE models. Note: Do not duct away,
create cooling air recirculation situations or obstruct the ventilation grills.
Water-cooled version (Wc)
Water-cooled version (Wc) - Note: It is recommended that a mesh fi lter
be installed on the cooling water inlet (not included with PSE as stand-
ard).
Y,
Inlet condensation water characteristics:
Temperature
≥50°F (10°C)
CL
-
41°-59°F
ΔT IN/OUT
CaCO
(5-15°C)
3
Max % glycol
50
O
2
43.5-145 PSIg
Pressure
Fe
(3-10 barg)
PH
7.5-9
NO
3
Electrical
10-500 μS/cm
HCO
-
conductivity
3
Langelier
saturation
0-1
H
S
2
index
SO
2-
<50 ppm
CO
4
2
NH
<1 ppm
Al
3
Note: For special cooling water types, such as demineralized, deionized
or distilled, it is necessary to contact the manufacturer to verify if the
standard PSE condenser is suitable.

3.4 Installation Environment

PSE dryers are to be installed indoors only. To prevent damage to the in-
ternal parts of the dryer and air compressor, avoid installations where the
surrounding air contains solid and/or gaseous pollutants (e.g. sulphur,
ammonia, chlorine and installations in marine environments).
The ducting of extracted air is not allowed for versions with axial fans.

Electrical connection

Use approved cable in that conforms with the local laws and regulations
(for minimum cable section, see par. 8.3).
Install a differential thermal magnetic circuit breaker with contact open-
ing distance 0.12in (3 mm) ahead of the system (RCCB - IDn = 0.3A) (see
the relevant current local regulations).
The nominal current of the magnetic circuit breaker must be equal to the
FLA with an interruption curve type D.

3.5 Condensate drain connection

Y
Make a connection to the draining system. Avoid connecting to a
closed circuit shared by other pressurized discharge lines. Ensure proper
condensate discharge. Dispose of all the condensate in conformity with
current local environmental regulations.

4 Commissioning

4.1 Preliminary checks

Before commissioning the dryer, make sure:
• All information in section 3 was read, understood and carried out
properly;
• the compressed air inlet and outlet isolation valves are closed and no
air is fl owing through the dryer;
• the power supply is correct;
<50 ppm
• Note: If using a Wc version, open the cooling water circuit 5 minutes
before starting the dryer.
70-150 ppm

4.2 Starting

<0.1 ppm
a) Switch the power on by turning the MAIN SWITCH "
<0.2 ppm
"I ON":
!
<2 ppm
THE CRANKCASE HEATER MUST BE SWITCHED ON 12
HOURS BEFORE STARTING THE DRYER.
70-300 ppm
<0.05 ppm
<5 ppm
<0.2 ppm
touch to see home screen
b) Touch
to strat, the button changes the color from grey to
green, to signal that the dryer is now in operation
Failure to comply with this rule may cause serious damage to the
compressor.
c) Start the dryer without the air compressor load;
Y
Fans (Ac version): if connected with the wrong phase sequence
they turn in the opposite direction, with the risk of being damaged (in this
2/10
&
" to
.

Publicidad

Capítulos

Tabla de contenido

Solución de problemas

loading

Tabla de contenido