Installing 24F.e.+2G.e. Gigabit Clustering Switch; Desktop Installation - Longshine LCS-SW2402S Manual Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

4. Installing 24F.E.+2G.E. Gigabit Clustering Switch

This switch can be placed directly on your desktop, or mounted in a rack. If you
install the device in a normal-standalone standard, the switch is an Intelligent
Switch, and users can immediately use most of the features simply by attaching
the cables and turning the power on. In this case, any managerial proceedings are
effective only in the range of the switch. After management stacking, you can
enjoy the powerful management functions and control the whole system.

4.1 Desktop Installation

For desktop installation, the switch needs to put on a clean, flat desk or table close
to a power outlet. Plug in all network cables and the power cord, then the system
is ready.
Before installing the switch, you must ensure:
1.
It is accessible and cables can be connected easily
2.
Cabling is away from:
Sources of electrical noise such as radios, transmitters and broadband
amplifiers
Power lines and fluorescent lighting fixtures.
3.
Keep water or moisture off
4.
Airflow around the unit and through the vents in the side of the case is great
for heat radiation (company recommend that you provide a minimum of 25
mm clearance)
To prolong the operational life of your units:
1.
Never stack unit more than eight sets high if freestanding
2.
Do not place objects on top of any unit or stack
3.
Do not obstruct any vents at the sides of the case
E-18

Publicidad

Tabla de contenido
loading

Tabla de contenido