Jacuzzi Profile Performance Ficha Técnica De Preinstalación página 14

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

I
Therefore, the drain well is to be positioned based on the s-
elected type of installation.
Profile can be installed in various ways:
- Free standing on the floor or on a specifically prepared base
i
(
5).
- Semi-built in, so that only the base of the spa is built-in and
therefore the side cover panels remain free (
case, it is appropriate to prepare some removable under-frames
(in marine plywood, etc.) that, besides aesthetically complet-
ing installation, allow the panels to be removed more easily. The
size of the built-in space in the floor is obtained from that of
i
the base of the spa (
i
- (
7-8) built-in, with the tub edge flush with the floor. In this
case, a base support must be made under the bottom of the tub
(in concrete and steel beams, (detail 1).
Access to the hosing must be ensured and to all other electro-
mechanical parts that are under the tub, for example by making
a passage along the outer perimeter, that is wide enough (about
80 cm) to carry out all electrical and hydraulic connections and
any maintenance operations (detail 2). This passage can be
closed using removable under-frames (detail 3), with suitable
supports (detail 4).
Drainage for any water stagnation must also be provided (detail
5).
I
In any case, you will need to provide a support base that is suit-
able for the load of the Profile spa as shown in the table of
weights above.
Prolonged sun exposure could damage the material of
which is made the spa shell, due to its capacity to absorb
heat (dark colours in particular). Don't leave the spa to sun
exposure without adequate protection when not in use
(cover thermal, gazebo, etc.).
Any damage arising by not following these warnings are
not covered by the guarantee.
ATTENTION: the support base must be as level as
possible to keep from compromising the capacity
of the tanks.
I
You can use a garden hose to fill the spa.
I
Profile Performance: the filtering assembly (spa-pak) can be
located anywhere, but not more than 4 m from the mini-pool. If
installation is outdoors (in very cold areas), it is recommended to
provide valves that allow for complete drainage of the pipes that
connect the spa
®
to the spa-pak.
If necessary, the spa-pak can be installed on a lowered surface
(with respect to the spa
®
) with a maximum height difference of 1m.
Greater height differences may reduce the flow rate of the filtering
pump.
The spa-pak must be installed so that it is cannot be accessed
by individuals without using keys, and protected from water and
inclement weather.
i
1).
If the spa is connected, for periodic filling, to the
mains system that supplies drinking water, this con-
nection must be carried out in compliance with the
EN1717 norm, using "AA", "AB" or "AD" anti-pollution
protection procedures. For further information, we
recommend you contact your water supply company
and/or your plumber.
I
If the spa is installed indoors, remember that water evapora-
6). In this
tion from the spa can cause very high levels of humidity, espe-
cially if temperatures are very high. Natural or forced ventilation
helps to maintain personal comfort and reduce damage to the
building due to humidity.
Jacuzzi Europe refuses all responsibility for any damage
caused by excessive humidity or by overflowing water. Con-
sult a specialist for indoor installation.
I Concerning suitability of the electrical system and of connections,
refer to the installation manual (see the chapter on
SAFETY
).
Electrical connections pre-arrangement
I
It is advisable to provide electricity with a single mono-phase
line, as shown in
- the terminal block of the electrical box is however set up for
supply with two single-phase lines (220-240 V 1N~).
- it is also possible to power the spa with a tri-phase line which
includes a neutral wire (380/415 V 3N~).
NOTE: if power is supplied with a double mono-phase line
(220-240 V 1N~) or with a tri-phase line with a neutral wire,
(380/415 V 3N~) before making the connection you will need
to remove the jumpers in the electrical box as per the instruc-
tions and diagrams in the installation manual.
I
The installer must in any case use properly protected cables
with a suitable cross-section
380/415 V 3N~: min. 2,5 mm
or to type H 05 VV-F.
Audio system
█ The Profile audio speakers can be connected to a cable au-
dio system (with signal level ~1W/8Ω): this must be done by
laying out a cable as indicated
I
Profile Performance: provide a cable for connection of the
pump of the spa-pak to the box of the mini-pool.
Note: The cross-sections of the wires must take account
not only the systems absorption but also the cable path
and the distances, the chosen protection systems and the
specific regulations for fixed electrical systems in force
in the country where the spa is installed.
The electrical box terminal board is designed for cables
with sections up to 6 mm
I
To ensure the degree of protection against splashes of water
as required by standards, and to make connection to the elec-
14
i
4.
(220-240 V 1N~: min. 4 mm
)
2
, with characteristics not inferi-
i
4.
2
.
ELECTRICAL
;
2

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

ProfileProfile performance

Tabla de contenido