Wiring Instructions - Lutron GRAFIC Eye 3000 Instrucciones Para La Instalación

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

030-739
8/1/02
Test load for short circuits
I
Turn power Off.
I
PB/ELVI: Connect standard switch between Hot/Live lead and
the load wire to test circuit.
I
FDBI: Connect standard switch between Hot/Live lead and the
Dimmed Hot/Live and switched Hot/Live leads of the ballast.
I
Turn power On and check for short or open circuits.
HOT/LIVE
SWITCH
HOT/
LIVE
LOAD
PB/ELVI

Wiring Instructions

1. Turn power Off to the Control Unit and the feed to the PB,
ELVI, or FDBI!
2. Mount standard U.S. 2-gang wallbox* (available from Lutron,
P/N 241-641), 3 1/2 in. (87 mm) deep is strongly recom-
mended, 2 3/4 in. (68 mm) minimum. Allow at least 4 1/2 in.
(110 mm) clearance above/below Interfaces to ensure proper
heat dissipation.
3. Strip 1/2 in. (12 mm) insulation from all wires in wallbox and
wire as shown. All connections are made using #12 AWG
(2.5 mm
) wire. Power terminals can accept up to two
2
#12 AWG (2.5 mm
2
) wires. The NEUTRAL N terminal is for
the Control neutral, not the load neutral! The recommended
installation torque is 9.0 in.
connections.
2:22 PM
Page 3
SWITCH
ORANGE
BALLAST
BLACK/BROWN
FDBI
G
lbs. (1.0 N
G
m) for line voltage
1/2 in. (12 mm)
Single-Feed Wiring for PB/ELVI
120V and 220-240V
The PB/ELVI may be on the same circuit as the Control
Unit only if the total load does not exceed the rating of
the breaker.
LOAD
Dual-Feed Wiring for PB/ELVI
120V and 220-240V
The load breaker/MCB can be on a different phase than the control
breaker/MCB.
LOAD
* Wallbox may be flush mounted or surface mounted. If mount-
ing Interface in a panel, please refer to Panel Mounting section
for important information.
3
H/L
N
NEUTRAL
4
3
2
HOT/LIVE
1
ZONE
LOAD NEUTRAL
H/L
N
NEUTRAL
4
3
2
HOT/LIVE
1
ZONE
LOAD NEUTRAL
N
H/L

Publicidad

Tabla de contenido

Solución de problemas

loading

Tabla de contenido