Zodiac CADET ROLL UP 200 Manual Del Propietário página 21

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

Activate all valves into inflation position.
Fit the hose to the foot-pump.
To inflate your boat properly, the bottom side of
the foot-pump must rest on a flat ground
Pump evenly to inflate rapidly.
CAUTION
You can use the electrical air pump ACCESS (ask your Dealer).
TO INFLATE THE MAIN BUOYANCY TUBE
• Insert the pump hose end piece
• Inflate (pressure = 240 mb, refer to PRESSURE section) making sure that each compartment is
equal. When correctly inflated, the internal bulkheads (a) are not visible.
NEVER COMPLETELY
INFLATE A
COMPARTMENT TO FULL
PRESSURE IF OTHER
COMPARTMENTS ARE
TOTALLY DEFLATED
CADET SOLID : INFLATE THE KEEL
• Once the floor in assembled, start inflation of the keel (pressure = 240 mb).
Inflation is over: fit the valve caps tight (clockwise).
NOTICE :
INFLATION
.
DO NOT USE A COMPRESSOR OR A BOTTLE OF COMPRESSED AIR
50 %
1
100 %
2
A slight air-leak before screwing the valve caps is normal.
ONLY THE VALVE CAPS CAN ENSURE FINAL AIR TIGHTNESS.
7
a
100 %
0 %
50 %
100 %
/ 10
0 %
50 %
100 %
E
N
G
L
I
S
H

Publicidad

Tabla de contenido
loading

Tabla de contenido