Unit Assembly - Omron HEM-18 Manual De Instrucciones

Ocultar thumbs Ver también para HEM-18:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

HOW TO FOLD THE CUFF
The cuff should already be folded through the metal D-ring when
you remove the cuff from the box. If the cuff is not prefolded, lay
the cuff flat in front of you. Place the metal D-ring on your left.
The stethoscope faces up. Pull the end of the cuff through the metal
D-ring. When the cuff is folded correctly, the hook and pile material
faces the outside of the cuff loop.
HOW TO ASSEMBLE THE UNIT
Lay the parts out as illustrated on the next page. Refer to the illustration
to help you put the unit together.
Follow these four easy steps:
Attach the gauge to tubing on the left.
1
Attach the inflation bulb to the tubing on the right.
2
Attach the single end of the Y-tubing to the stethoscope chestpiece.
3
Attach the double end of the Y-tubing to the binaural.
4

UNIT ASSEMBLY

4

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Hem-18s

Tabla de contenido