2.
Install the Supply Piping – Multiple Supplies
5" (12.7 cm)
5" (12.7 cm)
Pressure Balancing Loops
Boucles de régulation de pression
Soldering Template
Bucles de regulación de presión
Gabarit de soudure
Plantilla de soldar
Soldering Template
Gabarit de soudure
Plantilla de soldar
Route the water supply lines.
Use the provided soldering template to construct the pressure balancing loops.
Assemble the pressure balancing loop with a tee positioned over each of the four
raised locations on the soldering template.
Solder the assembly while it is still attached to the soldering template.
IMPORTANT! To maintain proper positioning of the tees and ensure alignment with
the product, the two pressure balancing loops must be rigidly connected to each other
while still on the soldering template.
While still on the soldering template, rigidly connect the two pressure balancing
loops to each other.
Remove the pressure balancing loop assembly from the soldering template.
Connect the pressure balancing loop to the water supply.
Do not strap the pipes.
Temporarily install a nipple to each tee. Do not use any sealant.
1095096-2-A
1/2" NPT Nipple
Mamelon de 1/2" NPT
Niple de 1/2" NPT
Rigidly connect the loops to each other,
while on the template.
Connecter solidement les boucles les
unes aux autres, en étant sur le gabarit.
Conecte rígidamente los bucles uno al
otro, mientras están en la plantilla.
6
Kohler Co.