DORMA
INSTALLATION / ADJUSTMENT /
COMMISSIONING
Electrical installation:
Electrical installation work must only be
performed by suitably qualified and trained
personnel.
Ensure compliance with local regulations
The electrical installation work (230 vAC ± 10%, 50/60
Hz) is performed by others.
According to German regulations
pushbutton (VDE 0660, part 207) must be installed in the
power supply line (feeder cable) close to the door. Check
also local regulations.
The operator (drive unit) is supplied complete with a
2-pole-and-earth mains plug (German Schuko type
available). An earthed outlet socket fused at 10 A must be
provided by others.
If earthed outlet sockets are not available, the mains
feeder cable must be externally positioned to install a
lockable main switch. From the main switch the feeder
cable is connected to the operator through the baseplate.
The main switch must disconnect all poles from the mains.
Fire and smoke rated doors:
The ED 200 is approved for installation on fire and smoke
rated doors according to the German Institute for Building
Technology, Berlin. An approval certificate for the fire /
smoke rated door is additionally required. The ED 200
must be installed in accordance with the approved and
certificated drawings and templates provided by the
manufacturer of fire and smoke rated door.
If the ED 200 is used in conjunction with hold-open
systems, a smoke detector is required (acc. to the German
regulations for hold-open systems – check also local
regulations). The smoke detectors can be connected
directly to the ED 200 with control module B, and powered
with a supply of 24 VDC (stabilised).
If the ED 200 is operated with control module A , use only
the smoke detector RMZ 2 (power supply 230 V AC) .
Further information:
Instruction sheet relating to the use and
application for hold open device systems.
Guidelines for hold open systems published by the
Institute for Building Technology Berlin
equivalent national guidelines.
Fixing to double doors
When fixing to double doors, it is important to ensure that
the ED 200 is installed with control module A on the
inactive leaf and with control module B on the active leaf.
On-site requirements
The following accessories are available for special on-site
installations:
Mounting backplate -
for indirect fixing due to presence of glass panels, narrow
frame, etc..
Various sizes of spindle extension -
for overcoming height differentials.
Arm variants -
for accommodating different reveal depths/door types.
ED 200 with standard arm -
As specified in German guidelines for power-operated
1 )
1 )
1 )
1 )
1 )
windows, doors and gates
These documents are only printed in German as they refer
2 )
2 )
2 )
2 )
2 )
exclusively to German market.
26
ED 200
, an emergency-off
1)
2)
or
2)
Installation on push side (opposite hinge side)
a
ED 200 with slide channel -
Installation on push side (opposite hinge side)
b
ED 200 with slide channel -
Installation on pull side (hinge side)
c
Preparation
Remove cover from the operator.
1
Dimensional drawing: Installation on push side
(opposite hinge side) with standard arm
2a
Dimensional drawing: Installation on push side
(opposite hinge side) with slide channel
2b
Dimensional drawing : Installation on pull side
(hinge side) with slide channel
2c
Standard setting on delivery is for right-hand
(DIN-R, ISO 5, CW closing) doors
3
To fit the operator to a left-hand door, the
microswitch and the cam must be refitted on the
other end of the spindle.
Pull out the plastic nut and unscrew the end cover.
4
Installing the operator
Secure the operator with 2 auxiliary mounting screws
and a minimum of a further 6 fixing screws.
When using steel profile sections drill pilot hole of
core diameter and tap thread (M 6).
When using LM profiles (aluminium alloy sections),
use riv-nuts (M 6).
In the case of fire/smoke rated doors, the
ED 200 must be installed in accordance with
the approved and certificated drawings and
templates provided by the door manufacturer.
Mark out and drill the holes for the auxiliary mounting
screws in accordance with the dimensioned drawing
5
and tap the thread if required.
Fix the auxiliary mounting screws
Distance between screw head and reveal or frame
surface = 6 mm.
Fix the operator to the auxiliary mounting screws.
Mark out the holes for the fixing screws through the
6
baseplate onto the frame section.
7a
Remove operator from baseplate.
Mark out the holes for the arm bracket /slide channel
7b
in accordance with the dimensioned drawing.
7c
Drill the holes and tap the tread if required.
Re-fit the operator.
Wind in the fixing screws (+ serrated lock washers)
and fix tightly.
8
Tighten the auxiliary mounting screws.
Fit the end caps and press in plastic nut.
9