Gate House G27D01 Manual Del Usuario página 10

Cerradura electrónica con pestillo desde el teclado
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

PREPARATION
4. PREPARE DOOR JAMB AND INSTALL STRIKE PLATE
Mark outline for dust box (O) and then drill a hole 1-3/16 in. (30 mm) deep by 1-9/16 in (40 mm)
tall by 1 in. (25 mm) wide to allow for installation of dust box (O). Chisel a 5/32 in. (4 mm) deep
outline for the strike plate (L) on the door jamb. Install the dust box (O) and the reinforced strike
place (N) with the 3 in. (76 mm) wood screws (M). Install the strike place (L) with the
3/4 in. (19 mm) wood screws (K).
Door jamb hole dimension:
1-3/16 in. (30 mm)
1-9/16 in. (40 mm)
1 in. (25 mm)
Strike dimension:
5/32 in. (4 mm)
2-3/4 in (70 mm)
1-1/8 in. (28 mm)
NOTE: The dust box (O) and reinforced strike plate (N) are optional. Install both for
maximum security.
N
08
O
M
L
K

Publicidad

Capítulos

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

G2x2d01

Tabla de contenido