GX75.book Seite 14 Freitag, 15. Juni 2007 9:43 09
EN
Electrical connection.
Observe mains voltage:
Adjustments.
Before any work on the machine itself, pull
the power plug from the socket outlet.
Adjusting the incline (Figure 10)
Adjusting the grinding rest (10) (Figure 5).
2 mm (max.)
Adjusting the face- grinding rest (20).
Adjusting the belt tracking.
briefly
Changing the grinding belt.
Before any work on the machine itself, pull
the power plug from the socket outlet.