Bosch 1 687 010 193 Manual Original página 32

Juego de accesorios para bombas de alta presión vdo common rail
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 52
en
en
32 | 1 687 010 193 / 1 687 016 193 | Preparation for testing
5. Fasten the intermediate flange (Fig. 22, item 1)
on the drive shaft (Fig. 22, item 2) of the VDO-CP.
Observe the tightening torque. (see table).
Intermediate flange
With shoulder bolt (left-hand thread, see the
section 3.5.5)
With collar nut (see the section 3.5.6)
1
2
Fig. 22:
Installing the intermediate flange
6. Connect the intermediate flange (Fig. 23, item 2) of
the VDO-CP to the intermediate coupling (Fig. 23,
item 2) and secure with the two fastening screws.
Tightening torque: 33 – 37 Nm
7. Secure the clamping bracket or clamping support to
the clamping rail of the EPS using the two fastening
screws (Fig. 23, item 3).
1
2
Fig. 23:
Pump mounting on drive coupling 1 686 401 024
|
1 689 989 337
2017-06-15
8. On an EPS 815, slide the touch guard (see Fig. 15,
item 2) over the drive coupling and secure.
9. Turn flywheel of the EPS 815 by hand and ensure
that grinding noises do not occur between the touch
Tightening
guard (Fig. 15, item 2) and intermediate flange (see
torque
Fig. 15, item 3). If grinding noises occur, correct the
40 Nm
fit of the touch guard.
"
The VDO-CP is clamped.
80 – 90 Nm
5.3.2
1. Slide the clamping bracket (optional accessory)
onto the clamping rail of the EPS.
!
The radial shaft seal must be oiled to test the VDO-
CP.
2. Lubricate the radial shaft seal on a VDO-CP with
15W-40 motor oil.
3. Secure the VDO-CP to the clamping flange (see the
section 3.5.1).
4. Secure the VDO-CP to the clamping bracket (Fig. 24).
Observe the tightening torque.
Fig. 24:
3
For a VDO-CP with Oldham connection
Pump mounting with the clamping bracket
M = 52 - 58 Nm
Robert Bosch GmbH

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

1 687 016 193

Tabla de contenido