Slide the plunger bracket forward against the vertical post and secure the
plunger bracket to the post flange with two user-supplied screws. Refer
to item 3 in the following figure.
4.
Repeat this procedure for the second rail.
Figure 2. Two-Post Flush-Mount Configuration
Two-Post Center-Mount Configuration
To install the Dell ReadyRails system using the two-post center-mount
configuration, follow these steps.
1.
Slide the plunger bracket rearward until it clicks into place and secure the
bracket to the front post flange with two user-supplied screws. Refer to
item 1 in the following figure.
2.
Slide the back bracket towards the post and secure it to the post flange
with two user-supplied screws. Refer to item 2 of the following figure.
3.
Repeat this procedure for the second rail.