Mounting informations
The drive will be full configured by factory.
The drives must be reconfigured in case of
alterations (e.g. removing of drives
from existing set or integrating
a new drive) with SCS.
At vertical active pulling application (e.g. for a
skylight) the forces must be rearranged by software
SCS
Pin Assignment
Standard
WH (Mot. a)
BN (Mot. b)
OG (-HS)
YE (Data A)
GN (Data B)
Connection: page 18 - 20
Shift of drive cable
99.823.89 2.4/12/13
Slave 1
Option -BRV
WH (Mot. a)
BN (Mot. b)
OG (-HS)
YE (Data A)
GN (Data B)
GY (-BRV)
PK (n.c.)
Only for ex-works programming
Debe ser encendido OFF
English
Mount the drives mechanical stress-free.
With that, a better load distribution
is ensured on all the drives.
If after mounting the measure x is as bigger as
23 mm, null balance with software SCS is neccesary.
Closure Ranges will shift in relation to new zero
point.
Option -SGI/-SKS
WH (Mot. a)
BN (Mot. b)
OG (-HS)
YE (Data A)
GN (Data B)
GY (- SGI / SKS)
PK (+ SGI / SKS)
The connecting cable is directly connected
to the drive and not changeable
DIP-Switch
X
≥ 23 mm ?
Option -SA/-SZ
WH (Mot. a)
BN (Mot. b)
OG (-HS)
YE (Data A)
GN (Data B)
GY (-SA / -SZ)
PK (-SA / -SZ)
7/20
KA-BSY+