Lifting/Handling - Mondolfo Ferro Startline S 524 Manual De Uso

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

- Mount the pole using screws P (Fig.6B), use
tightening torque 70 Nm.
- Undo the screw of the spring stop knob and insert
the spring contained in the packaging. Fasten
the knob using the previously unscrewed screw.
(fig.6C).
- Install the inflation pressure gauge box on the
pole (A, Fig. 6D).
- Fit the safety valve (B, Fig. 6D).
- Connect pipe G to the valve (Fig.6E)
- Refit the side cover N (Fig. 6A).

5. LIFTING/HANDLING

In order to remove the
machine from the pallet,
hook it as shown in figures
7A and 7B.
This lifting point must be
used whenever you need
to change the position
of the machine. Do not
attempt to move the
machine until it has been
disconnected from the
power and pneumatic
supply networks.
Startline S 424-S 421-S 521-S 524 Operator manual
6C
B
A
G
7A
6D
6E
UK
7B
107

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Startline s 521Startline s 421Startline s 424

Tabla de contenido