Zoeller 1463-0006 Instrucciones página 53

Ocultar thumbs Ver también para 1463-0006:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

5. Thread in priming plug and then open optional ball
valve if installed by turning handle to line up with
the pipe.
6. Turn on breaker to start pump.
7.
IMPORTANT: If the pump fails to prime within
five minutes:
Turn power off at the breaker box and check all pipe
connections for leaks. All connections must be water
and air tight in order for pump to operate.
All piping from the well to the pump should slope
slightly upward with no sagging. Support suction
pipe between water source and pump. Unions in
the suction line near the pump and well will aid in
servicing. Be sure to leave enough room so that
wrenches can be used easily.
NOTE: Look for leaks or a milky color in the
discharged water, which indicates an air leak.
Re-prime if necessary, following steps 1 through
6 above. Reset breaker at the breaker box. All
connections must be water and air tight in order for
pump to operate.
CARE AND MAINTENANCE
Winterizing
CAUTION: Drain the entire system if there is
danger of freezing. A drain plug is provided at the
bottom of the pump for this purpose.
5
6
Breaker Box
7
Unions
Water level
Foot valve
1
15
© 2020. All rights reserved.
IL2145
Slope pipe
upward
Pipe
support
PREVENT
PUMP
DAMAGE!
Remove plug in
freezing weather
IL2125

Publicidad

Tabla de contenido
loading

Tabla de contenido