cascade corporation 20G-77G Instrucciones De Instalación página 5

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 72
I
NSTALLATION
3
Prepare Hoses
A
Determine hose lengths required for
hydraulic supply configuration of truck.
B
Cut hoses to length and install end
fittings, or use hose kits supplied.
IMPORTANT: Valve options include LH or RH supply
porting for Clamp/Open and Sideshift Left/Right.
External sideshifter has top center location porting
suitable for both LH or RH supply connections.
RH CLAMP,
LH SIDESHIFT
Sideshift Right
Ports
Sideshift Left
Sideshifting Clamp – Double Hose Reels
EXTERNAL
SIDESHIFTER-
EQUIPPED
Sideshift Left
External Sideshifting Clamp – Double Hose Reels
4
Flush hydraulic supply hoses
A
Install hoses using union fittings.
B
Operate auxiliary valves for 30 sec.
C
Remove union fittings.
6033701-R6 EN
Clamp
Open
CL2789.eps
Open
Clamp
Sideshift Right
CL3378.eps
RH CLAMP
Ports
Non-Sideshifting – Single Hose Reel
LH CLAMP,
RH SIDESHIFT
Ports
Open
Sideshifting Clamp – Double Internal Hose Reeving
SOLENOID-EQUIPPED
RH or LH CLAMP Ports
Sideshifting with Solenoid – 6-N-1 Cable/Hose Reel
Back (Driver's) Views
Clamp
Open
CL2794.eps
Clamp
Sideshift Right
Sideshift Left
CL2755.eps
SSL / Open
(TANK Port)
Solenoid Cable
CL3021.eps
SSR / Clamp
(PRESSURE
Port)
3

Publicidad

Tabla de contenido
loading

Tabla de contenido