Washbar Installation; Aerator Installation - Bradley Verge LVQ Serie Manual Del Usuario

Sistema de lavabo con tecnología washbar
Ocultar thumbs Ver también para Verge LVQ Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

LVQD1
3
WashBar Installation – WB1 & WB2
WB1 is shown for these instructions.
WashBar comes pre-assembled,
with the exception of the aerator.
When attaching flexible PVC
dryer tube, be sure tube is
touching the WashBar nut
when complete.
A
Position bowl on the
floor, upright, as shown.
B
Assemble WashBar through basin
WashBar holes. Run cables and
tubes on left side only.
Soap Tube (Clear), ¹/₄" Water Tube,
LED Cable (Gray), Soap Sensor
Cable (Shorter Cable), and Air/
Water Cable (Longer Cable)
4
Aerator Installation – WB1 & WB2
WB1 is shown for these instructions.
Carefully thread the aerator into
A
the WashBar casting using the red
service key provided. Ensure no
leaks after installation.
14
WashBar
1/21/2021
Connect grounding wire spade
E
terminal end to grounding washer
tab. Do not attach grounding wire
plug adapter to wall outlet until later
in the installation procedure.
Grounding Washer,
0.25 QC
D
Nut, WashBar,
1³⁄₈-18
For WB1 & WB2: Secure
from underside with (2)
nuts and (1) grounding
washer (right side only).
C
For WB2 Only: Install the
custom spacer (182-142)
between deck and nut
(left side only) with spacer
groove side up against
deck. Refer to page 5.
F
Attach the ¹/₄" supply
tube to the ¹/₄" union
elbow.
Aerator
(0.35 gpm or
0.5 gpm)
Red Service Key
Bradley • 215-1842 Rev. H: ECO 20-08-028B
Installation
Attach flexible PVC dryer
tube to shank using
hose clamp. Tighten to
30-35 ft-lb using ⁵/₁₆"
socket.

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Verge lvqd1

Tabla de contenido