Connecting The Wires To The Terminals; Connecting The Rapid Shutdown Box To A Snapinverter - Fronius Rapid Shutdown Box-Duo Instrucciones De Instalación

Ocultar thumbs Ver también para Rapid Shutdown Box-Duo:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Connecting the
wires to the Ter-
minals
Connecting the
If the AC supply is interrupted, the inverter disconnects the PV DC supply via the Rapid
Rapid Shutdown
Shutdown Box. As soon as the AC supply is reinstated, the DC supply will resume.
Box to a SnapIN-
verter
The signal relay in the Fronius inverter opens if the inverter loses the AC connection.
The Rapid Shutdown Box interrupts the DC connection. However, the signal relay can
no longer be used for other functions (energy manager, alarm, etc.) if the rapid shut-
down initiation is to be triggered by an AC failure on the inverter.
The inverter does not need to be configured after connecting the Rapid Shutdown Box. If
settings have already been made regarding energy management, check this section in
the inverter Operating Instructions. The energy manager (relay mode) must be set to
'ON' (factory setting).
16
A1
DC-Output
Duo / Quattro
Quattro
A2
Signal Port
Duo / Quattro
Duo

Hide quick links:

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Rapid shutdown box-quattro

Tabla de contenido