Snapinverter: Connecting The Rapid Shutdown Box To An Emergency Stop Button - Fronius Rapid Shutdown Box-Duo Instrucciones De Instalación

Ocultar thumbs Ver también para Rapid Shutdown Box-Duo:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Optional: Connecting the Grounding to a Ground Lug - Variant 1
1
Optional: Connecting the Grounding to a Ground Lug - Variant 2
1
SnapINverter:
Connecting to an external emergency stop button:
Connecting the
If an external emergency stop is required, it can be installed anywhere in the signal line.
Rapid Shutdown
When the connected emergency stop button is pressed, the Rapid Shutdown is started
Box to an emer-
and the PV field is disconnected from the inverter. As soon as the emergency stop button
gency stop but-
is returned to its original position, the PV field is reconnected.
ton
Requirements for the external emergency stop button:
-
-
Maximum switching load: 30 V DC / 5 mA
Nominal voltage between contacts and housing: 600 V DC
2
2
19

Hide quick links:

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Rapid shutdown box-quattro

Tabla de contenido