Fit the handle
•
Remove the screws (A).
•
Remove the locking knobs (B).
•
Fit the handle in the handle stand-off on the machine.
•
Refit screws (A) and locking knobs (B).
•
The locking knobs should be positioned in-line with the
handlebar to reduce the risk of damaging the knobs when
laying down the machinge when changing tools.
8 –
English
ASSEMBLY
Changing the diamonds
Shut down the machine and disconnect the power plug.
Have a set of gloves ready, as diamond tools can get very hot.
•
Crank up the handlebar to the highest position.
•
Pull back on handle to lift grinding head off the ground.
•
Lay machine back on the ground.
•
Put on gloves.
•
Use a hammer to remove the diamond segments.
•
Affix new diamond segments on the grinding disc.
•
Once new diamond segments have been attached,
reverse procedure to lower machine to ground.