Descargar Imprimir esta página

Kohler K-T10302 Guia De Instalacion página 5

Publicidad

Idiomas disponibles

Idiomas disponibles

2. Adjust the Handle Assembly
Ensure the valve stem adapters are lightly placed over the spline
adapters.
Place the handle assembly over the valve stem adapter of the
volume control valve (top).
Turn the handle assembly counterclockwise until it stops. The
volume control handle assembly should be in the vertical 12
o'clock position. This is the off position.
Remove the handle assembly and set aside.
Place the remaining handle assembly over the valve stem adapter
of the thermostatic valve (bottom).
Turn the handle assembly clockwise until the stop is contacted.
The valve will be in the full cold position. The handle should be
between the 9 and 10 o'clock positions.
Rotate the handle assembly counterclockwise, through the detent,
then to the high temperature limit stop.
Verify that the handle assembly is between the 3 and 4 o'clock
position.
Rotate back to 6 o'clock position.
Remove the handle assembly and set aside.
NOTE: The spline adapter allows fine adjustment of the handle
alignment.
Kohler Co.
Volume Control Valve
Valve Stem Adapter
Thermostatic
Valve
5
Handle Assemblies
1041504-2-E

Publicidad

loading

Este manual también es adecuado para:

K-t10422K-t10427K-t10594K-t10941K-t14489K-t16176