Combustion Head Setting - Riello RL 190 Instrucciones De Instalación, Uso Y Mantenimiento

Quemadores de gasóleo
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation
5.9

Combustion head setting

The setting of the combustion head depends exclusively on the
burner delivery in the 2nd stage - in other words, the combined
delivery of the two nozzles selected in table (Tab. A).
Turn screw 4)(Fig. 12) until the notch shown in diagram (Fig. 13)
is level with the front surface of flange 5)(Fig. 10, pag. 12).
Example:
The RL 190 Model with two 18 GPH nozzles and 12 bar pump
pressure.
Fig. 12
Find the delivery of the two 18 GPH nozzles in (Tab. A, pag. 7):
D462
76.4 + 76.4 = 152,8 kg/h.
Diagram (Fig. 13) indicates that for a delivery of 152,8 kg/h the
RL 190 Model requires the combustion head to be set to approx.
three notches, as shown in (Fig. 12).
Notches no.
D1250
Light oil delivery in 2nd stage kg/h
Fig. 13
13
GB
2916074

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

673 t1347561320011008

Tabla de contenido