Eaton 91PS Guía Rápida De Seguridad E Instalación página 11

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 108
2.3.4
Unpack and unload the UPS
The unpacking and unloading of the UPS is shown in illustrations 9.1 - 9.8.
Before you start to unpack and unload the UPS, check the TipNTell and DropNTell
indicators on the package surface. If the equipment has been correctly transported in the
upright position, the indicators should be intact. If the TipNTell indicator arrow has turned
all blue or the arrow head(s) of the DropNTell indicator are black, contact the appropriate
parties to report inappropriate transportation.
For transportation purposes, the UPS cabinet is bolted onto a wooden pallet. Before you
unload the cabinet from the pallet, use a forklift or other material handling equipment to
move the cabinet to the installation area.
The UPS cabinet is heavy. If the unpacking instructions are not closely obeyed, the
cabinet may tip over and cause serious injury.
Do not tilt the UPS cabinet more than 10 degrees from the vertical or the cabinet may tip
over.
NOTE: After you have removed the shipping brackets, move the unit immediately away
from the pallet.
After you have removed the shipping brackets and retracted the leveling feet, do not use
a forklift to move the unit while it is still on the pallet. Note that the UPS cabinet is heavy
and there are casters under the cabinet.
If you remove the cabinet from its original installation location and transfer it to a new
location on a pallet, lower the leveling feet so that the cabinet is not resting on the
casters and attach the shipping brackets to the cabinet and the pallet.
2.4
UPS system installation
The operator has to supply the wiring to connect the UPS to the local power source. The
installation of the UPS must be made by a locally qualified electrician. The installation
inspection and the initial start-up of the UPS and installing an extra battery cabinet must be
carried out by an authorized Eaton Customer Service Engineer or by a qualified service
personnel authorized by Eaton.
2.4.1
Steps to install the UPS
The installation of the UPS is shown in illustrations 10.1-10.5.
The UPS power cable terminals are shown in illustrations 6.1 (91PS 15 kW frame), 6.2
(93PS 20 kW frame), 7.1 (91PS 30kW frame with a common battery), 7.2 (91PS 30kW
frame with a separate battery option), 8.1 (93PS 40kW frame with a common battery) and
8.2 (93PS 40kW frame with a separate battery option).
X1
Rectifier input
X2
Bypass input
X3
UPS output
X4/+
External battery +
UPM2
(separate battery)
WARNING
X4/-
External battery -
TB20
External battery trip
TB21
External battery trip
PE
Protective earth
EN
9

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

93ps

Tabla de contenido