MAIN FRAME ASSEMBLY
1.
The main frame assembly of this machine consists of
the rails, conveyor drive motor, and the operator panel.
TUNNEL CONVEYOR ASSEMBLY MESH BELT
1. This assembly consists of the tunnel conveyor belt
assembly including the DC gear motor. The belt is
heated by a 500W heat element mounted under
the conveyor pan. The heated belt provides positive
shrink on the bottom of the package. The assembly
also includes belt guides and tracking screws.
TUNNEL CONVEYOR ASSEMBLY HEATED BELT
1. This assembly consists of the heated belt including
the DC gear motor. The belt is heated by a 500W
heating element mounted under the conveyor
pan. The heated belt provides positive shrink on the
bottom of the package. The assembly also includes
belt guides and tracking screws.
TUNNEL ASSEMBLY
1. The tunnel assembly set on the tunnel conveyor
uses heated recirculated air to shrink the film onto
the package. The assembly has its own power cord
and requires a dedicated 20Amp circuit. The blower
motor runs in a counterclockwise direction when
looking at the non-shaft end. (See Figure 2)
IMPORTANT! Prior to machine set up and
installation the general warnings should be
read and fully understood by all personnel
associated with this machinery.
SET-UP INSTRUCTIONS
1.
Remove the tunnel from the crate or box.
Inspect for damage.
2. If available, attach the console stand to the tunnel
conveyor rails. See the enclosed instructions for the
stand. Level the machine using the levelers.
3. Place the tunnel on the conveyor with the operator
panels toward the front.
4. Remove any ties used for shipping.
5. Connect machine to power source. Power supply
for the tunnel should be 220 Volt, 10 Amp grounded
power supply. (Have an electrician install a plug on
the power cord, if you are plugging the tunnel into
an electrical outlet.)
PAGE 3 OF 15

MACHINE COMPONENTS

ELECTRICAL PANEL ASSEMBLY
1. This assembly is located under the drive roller. Only
2. Electrical schematics can be found in the original
OPERATOR PANEL ASSEMBLY
1. The operator assembly panel consists of the ON/
2. The ON/OFF switch also acts as a circuit breaker for
3. The Conveyor Speed is controlled using a DC Drive
4. The Conveyor Temperature is controlled using a
CONSOLE LEG KIT (
1.

INSTALLATION AND SETUP

6. Turn on the power to the conveyor using the ON/OFF
7.
8. Test run a few products through the machine to fine
9. When finished, turn the tunnel and conveyor
a qualified technician should access this assembly.
WARNING! Do not tamper with electrical wiring
unless licensed or trained to do so. Disconnect
main power to the machine before attempting
any electrical service.
manual.
OFF switch, adjustment for the conveyor speed and
conveyor temperature if available.
the conveyor system. (See Figure 1)
Board (203-61) mounted in the Operator Panel. The
speed can vary from 0 feet per minute to 60 feet
per minute.
variable voltage supply.
Optional, see below
ULINE item H-2035.
CAUTION! Machine should be grounded in
accordance with local electrical codes.
switch. Turn on the tunnel using its ON/OFF switch.
Ensure the tunnel conveyor is slowly running.
Ensure the tunnel blower is working. Turn the tunnel
temperature to 325º F. When the tunnel has reached
temperature, check the tracking of the tunnel
conveyor's belt.
tune the settings in order to achieve as tight a bag
around the product as practical. This will aid in the
shrink process.
temperatures off. Wait 15-20 minutes and turn off the
tunnel and conveyor.
)
0521 IH-2034