Set-Up Instructions - Uline H-2034 Manual Del Usuario

Túnel termoencogible
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

CAUTION! Assembling the leg kit to the
conveyor can be dangerous. Two people or
a mechanical lift device must be used to
position the conveyor above the leg kit until
they are attached.

SET-UP INSTRUCTIONS

1.
Remove the leg kit from the crate. Inspect for
damage.
2. To adjust leg length, remove shipping bolts from legs
(1 bolt per leg). Adjust leg length by measuring the
desired height and subtracting 12" to account for
the conveyor and caster height.
3. Place legs upside down on floor. Position shelf on
legs. Insert socket screws through shelf and each leg
from outside (7 places per leg). Tighten screws with
flat washers, lock washers and nuts. Use a socket
wrench. (See Figure 3)
Outside
PAGE 4 OF 15
OPTIONAL LEG KIT INSTALLATION AND SETUP
Figure 3
4. Screw feet into threaded holes provided on bottom
of the shelf. Insert casters into nylon insert next to
feet. (See Figure 4)
Upside Down View
5. Turn the leg kit right side up. Place conveyor on top
of the leg kit assembly. Insert hex bolts through the
conveyor and leg kit (2 bolts per corner). Tighten
bolts with flat washers, lock washers and nuts.
(See Figure 5)
Hex
Bolt
Socket Screw
Figure 4
Socket Screw
Hex
Bolt
Figure 5
0521 IH-2034

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

H-2035

Tabla de contenido