Apply sealant
4. Install the Bottom Track
Apply a 1/4" (6 mm) bead of silicone sealant into the groove on the underside of the track and a
small bead on the opposite leg.
Install the bottom track with the sealant side down and the front leg facing the outside of the
shower.
5. Install the Wall Jambs
Place a wall jamb over the bottom track. Align the holes in the wall jamb with the holes in the wall.
Secure the wall jamb to the wall with three #8-18 x 1-1/2" panhead screws.
NOTE: The middle screw should be inserted through a bumper before being installed. Do not overtighten
the middle screw or damage to the bumper may occur.
Repeat the procedures with the other wall jamb.
1015439-2-C
Bottom Track
Front Leg
8
Bumper
#8-18 x 1-1/2"
Panhead Screw
Kohler Co.