Maintenance Of The Oleodynamic Power Unit; Cleaning Operations - Pegasolift T14 Guía Para El Uso Y El Mantenimiento

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

MAINTENANCE OF THE OLEODYNAMIC POWER UNIT

MAINTENANCE OF THE OLEODYNAMIC POWER UNIT
Periodically it is necessary to control the level of ole-dynamic power unit which directs
Periodically it is necessary to control the level of ole-dynamic power unit which directs
the lifting operations of the lifting group, in order execute the following instructions:
the lifting operations of the lifting group, in order execute the following instructions:
1) Lower the lifting group at the minimum possible height.
1) Lower the lifting group at the minimum possible height.
2) Disconnect the start key (reference page 12 "Instruments" no. 1).
2) Disconnect the start key (reference page 12 "Instruments" no. 1).
3) Open the electronic components cover.
3) Open the electronic components cover.
4) Control the level of the oil in the tank of transparent plastic (2); if necessary unscrew
4) Control the level of the oil in the tank of transparent plastic (2); if necessary unscrew
the tank cap (3) and execute the filling up with oil for electro-dynamic circuits with a
the tank cap (3) and execute the filling up with oil for electro-dynamic circuits with a
viscosity ISO VG46 with the help of a long funnel.
viscosity ISO VG46 with the help of a long funnel.
5) Screw again with care the tank cap paying attention to not soil the oil with impurity.
5) Screw again with care the tank cap paying attention to not soil the oil with impurity.
6) Close the electronic components cover.
6) Close the electronic components cover.
1) The cleaning operations should not be executed with easy inflammable liquids or with
1) The cleaning operations should not be executed with easy inflammable liquids or with
tools from metals able to ruin the stacker body.
tools from metals able to ruin the stacker body.
2) During the cleaning operations, all the electric parts should be covered in order to
2) During the cleaning operations, all the electric parts should be covered in order to
avoid corrosion of contacts and short-circuits.
avoid corrosion of contacts and short-circuits.
3) It is prohibited to execute the cleaning with water under pressure or with vapor
3) It is prohibited to execute the cleaning with water under pressure or with vapor
4) Before use the stacker, check if there are not water stains and that all the circuits are
4) Before use the stacker, check if there are not water stains and that all the circuits are
dried up.
dried up.
CLEANING OPERATION
CLEANING OPERATION
C 21 53
53
3
3
2
2

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

T14 inox

Tabla de contenido