Electrical Requirements
If serial plate voltage is:
200-220 Volt/60 Hertz/
1 Phase
2W&G
200 Volt/50 Hertz/
1 Phase
2W&G
200-220 Volt/60 Hertz/
1 Phase
2W&G
200 Volt/50 Hertz/
1 Phase
2W&G
54
Tumbler can be converted to the following voltages:
100 Volt/60 Hertz/1 Phase Nonreversing INTERNATIONAL Models:
2W&G
100 Volt/50 Hertz/1 Phase Nonreversing INTERNATIONAL Models:
2W&G
1. Prior to connecting electric service, locate transformer configuration jumper
in junction box area.
2. Remove the 208 Volt jumper and replace it with the 100 Volt jumper located
in the literature packet from cylinder.
3. Remove small access cover from back of the fan motor. Locate the two
internal jumper wires, brown and blue connected to motor terminals #6 and
#2. Move brown wire from terminal #6 to terminal #2 and blue wire from
terminal #2 to terminal #4. Be careful not to confuse light blue motor harness
wire with the dark blue internal jumper.
4. Carefully check motor wire connections with wiring diagram and verify that
the motors are configured for low voltage operation before replacing covers.
5. For stacked tumblers, repeat steps 1 through 4 for each upper and lower unit.
6. Sign and date conversion sticker located on back of tumbler.
7. Follow the instructions covered in Connecting Electrical Service section.
100 Volt/60 Hertz/1 Phase Reversing INTERNATIONAL Models:
2W&G
100 Volt/50 Hertz/1 Phase Reversing INTERNATIONAL Models:
2W&G
1. Prior to connecting electric service, locate transformer configuration jumper
in junction box area.
2. Remove the 208 Volt jumper and replace it with the 100 Volt jumper located
in the literature packet from cylinder.
3. Remove small access cover from back of the fan motor. Locate the two
internal jumper wires, brown and blue connected to motor terminals #6 and
#2. Move brown wire from terminal #6 to terminal #2 and blue wire from
terminal #2 to terminal #4. Be careful not to confuse light blue motor harness
wire with the dark blue internal jumper.
4. Locate cylinder motor and remove conduit box cover on side of motor.
Remove the plug with orange jumper wires and replace with plug assembly
with black jumper wires from material packet.
5. Carefully check motor wire connections with wiring diagram and verify that
the motors are configured for low voltage operation before replacing covers.
6. Sign and date conversion sticker located on back of tumbler.
7. Follow the instructions covered in Connecting Electrical Service section.
© Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT
70223701