Kohler K-304 Guia De Instalacion página 6

Válvula reguladora de presión
Ocultar thumbs Ver también para K-304:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

72" (182.9 cm) –
78" (198.1 cm) to
Floor (Typical)
Bath/Shower
Installation
10"
(25.4 cm)
4" (10.2 cm)
72" (182.9 cm) –
78" (198.1 cm)
to Floor (Typical)
48" (122 cm)
to Floor
Shower Installation
3. Install the Valve
Install the valve on the support framing so the "UP" mark on the
valve is facing upward.
Install elbows and adapters (if needed) to 1/2" copper tubing or
1/2" pipe of proper length. Apply thread sealant, and connect the
piping to the bath and shower outlets of the valve.
For copper or iron supplies: Connect the water supplies to the
valve body using elbows, 1/2" copper tubing or pipe, and
adapters (if needed). Use thread sealant on all threaded
connections.
For CPVC supplies: Connect the water supplies to the valve
body using CPVC elbows, 1/2" CPVC tubing, and CPVC
adapters. Use thread sealant on all threaded connections.
For PEX supplies: Install a 1/2" water supply using a PEX copper
crimp ring. Refer to the instructions provided by the PEX crimp
tool manufacturer to properly install the PEX copper crimp ring.
IMPORTANT! Secure the piping to the framing.
Temporarily install 1/2" nipples to the bath and shower elbows
so they will extend at least 2" (5.1 cm) beyond the finished wall.
If you removed the inner valve components for soldering,
carefully reinstall them now.
114811-2-CG
Shower Ell
1/2" Copper
or Pipe
1/2" Adapter or
Solder Direct
Shower Outlet
Hot Side
1/2" Copper
or Pipe
Bath Outlet
1/2" Adapter or
Solder Direct
Bath Ell
6
Kohler Co.

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

K-305

Tabla de contenido