Commissioning And Operation - Klarstein Hot Spot Pebble Manual Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

COMMISSIONING AND OPERATION

Before Use
• Before use, make sure that the towel rack fixing nut is tightened.
• Rotate the towel rack down or up according to your needs.
• Before use, make sure the product is well fixed on the wall.
Operation
1. Plug in the power and turn on the main power switch on the back of the appliance.
The appliance enters the standby state. The display shows the following (digital tube
shows S).
2. Press the "F" button on the appliance once, the appliance works in cold air, and the
display shows the following A (the digital tube displays "-").
3. Press the "F" button twice, the appliance works at low heat, and the display shows
the following B.
4. Press the "F" button three times, the appliance has high heat work, the display
shows the following C.
5. Press the "F" button four times to enter the standby state (the appliance needs to
delay blowing cold air for 30 seconds).
EN
23

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

10035077

Tabla de contenido