Installation instruction
Tighten torque as the table below:
For gas pipe
For liquid pipe
E. Additional refrigerant charging
Charge the additional refrigerant as liquid state with the gauge.
If the additional refrigerant can not be charged totally when the outdoor stops, charge it at the trial mode.
If the unit runs for a long period in the state of lack of refrigerant, compressor will occur failure.
(the charging must be finished within 30 minutes especially when the unit is running, menawhile charging the refrigerant).
A. Charging amount when out of factory excludes the refrigerant in the pipe.
B. The unit only is charged the standard volume of refrigerant (distributing pipe length is 0m).
Additional charging amount=actual length of liquid pipe x additional amount per meter liquid pipe
Additional charging amount=L1×0.35+L2×0.25+L3×0.17+L4×0.11+L5×0.054+L6×0.022
L1: total length of 22.22 liquid pipe
L4: total length of 12.7 liquid pipe
C. Refrigerant charging and additional charging
Model
Ø22.22
AWAU-YCV080-H11
AWAU-YCV150-H11
AWAU-YCV150-H13
0.35
AWAU-YCV180-H13
Note:
• To prevent the different oil into the pipe, please use the special tool for R410A, especially for gauge manifold and
charging hose.
• Mark the refrigerant type in different colour on the tank. R410A is pink.
• Must not use the charging cylinder, because the R410A will change when transferring to the cylinder.
• When charging refrigerant, the refrigerant should be taken out from the tank as liquid state.
• Mark the counted refrigerant volume due to the distributing pipe length on the label.
GWP: 2088
The product contains fluorinated greenhouse gases and its functioning relies upon such gases.
Heat insulation
• Gas pipe and liquid pipe should be heat insulated separately.
• The material for gas pipe should endure the high temperature
over 120°C.That for liquid pipe should be over 70°C.
• The material thickness should be over 10mm, when ambient
temp. is 30°C, and the relative humidity is over 80%, the material
thickness should be over 15mm.
• He material should cling the pipe closely without gap, then be
wrapped with adhesive tape. The connection wire can not be put
together with the heat insulation material and should be far at
least 20cm.
Fix the refrigerant pipe
• In operation, the pipe will vibrate and expand or shrink. If not being fixed, the refrigerant will focus on one part to cause
the broken pipe.
• To prevent the central stress, fix the pipe for every 2-3m.
Tighten torque N.m
Shaft (valve body)
Cap (cover)
Less than 7
Less than 30
7.85 (MAX15.7)
29.4 (MAX39.2)
L2: total length of 19.05 liquid pipe
L5: total length of 9.52 liquid pipe
Additonal refrigerant charging per meter(kg/m)
Ø19.05
Ø15.88
0.25
0.17
T-shape nut (check joint)
13
8.8 (MAX14.7)
L3: total length of 15.88 liquid pipe
L6: total length of 6.35 liquid pipe
Ø12.7
Ø9.52
0.11
0.054
Liquid pipe
13
Charge when out of factory
Ø6.35
0.022
Refer to label
Connection wire
over 20cm
Adhesive tape
Gas pipe
Heat insulator