11. CONTROL AND mAINTENANCE
1. Check whether or not the service unit (9) goes with the
14. Check the O-rings at the new service unit (12, 1).
1. Mount the design shell (11).
16. Mount the service unit along with the design shell at
17. Re-install the ENL 10 at the inlet tubing and outlet, in
Installation of the control unit on the ENL 10:
1.
2.
.
4.
Start-up subsequent to maintenance measures:
Always carry out prior to the start-up:
ingersollrandproducts.com
control unit (1...8) (model designation and color of the
arresting hook).
the condensate receiver tank (19) and tighten both
erection bolts (22) (2, Nm).
reverse order to disassembly.
Check whether or not the service unit with contact
springs (28) is clean, dry, and free from impurities.
Introduce the sensor () into the service unit (9).
Hang the hook (29) of the control unit (1...8) in the
service unit (9).
Press the control unit (1...8) against the service unit (9),
snap into place and make sure it is securely mounted.
Leak test of the screwed connector of the condensate
receiver tank and of the connection of this tank to the
service unit.
Check of the electrical connections.
Check of the correct engagement of the control unit.