Kohler K-498 Guia De Instalacion página 9

Torre de ducha de montaje a la pared
Ocultar thumbs Ver también para K-498:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Install the Tower (cont.)
With help, carefully lift the tower into place.
Use shims to raise the tower between 1/16" (2 mm) and 1/8" (3 mm) off the finished basin.
Line up the lag bolt holes with the holes in the wall.
Attach the tower to the wall with two 1/2" x 3" lag bolts and flat washers (included). Do not
tighten.
Verify that the tower is plumb and securely wrench tighten the lag bolts.
Remove the shims from under the tower.
Kohler Co.
9
1010418-2-D

Publicidad

Tabla de contenido
loading

Tabla de contenido