Hitching The Planting Unit To The Equipment - GASPARDO PENTA PE 300 Empleo Y Mantenimiento

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

ENGLISH

3.2.3 HITCHING THE PLANTING UNIT TO THE EQUIPMENT

Hitching the planting unit to the equipment is a very dangerous
operation. Be very careful in following the instructions for the
whole operation.
It should be carried out on a firm, horizontal surface with the
planting unit placed on its support props.
1) Remove the guards from the pulley and the belts (A, B Fig.
11).
2) Grease the guides (C Fig. 12) of the triangle to facilitate the
hooking up, and make sure that the spring pin is positioned
as shown in Figure 12 ref. B.
3) Bring the tractor to the seeder; using the lift, move the quick
connect triangle until it is vertically above the coupling triangle
of the seeder (Fig. 12).
During coupling of the planting unit and the equipment there
must be no one standing in the area between the two.
4) Check that there is no interference between the mechanical
parts of the two machines, before lifting the equipment to
hook onto the seeder. Particularly check the area between
the rear roller and the arms of the sowing teeth (Fig. 13).
5) Lift the equipment until the two parts are perfectly coupled
along the triangle guides with the insertion of the spring dowel
(A Fig. 12).
6) Slip out the parking feet (Fig. 8).
7) Lower the lift and place the combined equipment in an
operating position. Check that all the sowing parts oscillate
freely, including the drive wheels and the seed-covering
harrow. Check that the equipment is in the correct position,
perpendicular to the ground, and if necessary move the third-
point of the equipment (B Fig. 13).
During the work, regularly check that the equipment is
perpendicular.
38
DANGER
ATTENTION
USE AND MAINTENANCE
fig. 11
A
A
B
fig. 12
g
B
C
B
fig. 13
cod. 19501163

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Penta pe 400Penta pe serie

Tabla de contenido