Installation Inside Mount; Important - Levolor Fabric Instalación

Ocultar thumbs Ver también para Fabric:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALLATION
INSIDE MOUNT (IM)
STEP 1: MARKING THE BRACKET LOCATIONS
IMPORTANT: Before marking bracket locations, ensure that your bracket placement
will not interfere with any components inside the headrail.
Verify that your window casing has a minimum depth
of 1
" which allows for a partially recessed
1
4
headrail mount.
If flush mount (fully recessed mount)
is desired, a minimum mounting depth
of 3" is required.
Mark approximately 1" from each
jamb for bracket location.
Mark screw locations for each end
bracket, 2 holes per bracket.
If more than two installation brackets
come with your order, space additional
bracket(s) evenly between the two end
brackets, no more than 30" apart.
STEP 2: INSTALLING THE BRACKETS
Pre-drill screw holes.
If installing brackets into wood, used
supplied screws.
If installing into drywall, use
anchors in combination with
supplied screws.
Screw in brackets at marked locations,
2 screws per bracket.
Ensure all brackets are square
with each other.
8
Continuous Cord Loop Lift Control–Cassette Valance
Bracket
Bracket
Bracket
Bracket
Screw
Screw

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

SolarBanded

Tabla de contenido