Installation Of Outdoor Unit - Saivod ASG0718I Manual Del Usuario

Ocultar thumbs Ver también para ASG0718I:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation of outdoor unit

(select it according to the actual installation situation)
1. Select installation location according to the house structure.
2. Fix the support of outdoor unit on the selected location with expansion screws.
Note:
installing the outdoor unit.
● Make sure the support can withstand at least
four times of the unit weight.
● The outdoor unit should be installed at least
joint.
● For the unit with cooling capacity of 2300W
~5000W, 6 expansion screws are needed;
for the unit with cooling capacity of 6000W
~8000W, 8 expansion screws are needed;
for the unit with cooling capacity of 10000W
~16000W, 10 expansion screws are needed.
Step two: install drain joint
(
O
n
y l
f
r o
c
o
l o
unit)
1. Connect the outdoor drain joint into
the hole on the chassis, as shown in
the picture below.
2. Connect the drain hose into the drain
vent.
drain vent
Drain hose
n i
g
a
n
d
h
e
t a
n i
chassis
outdoor drain joint
at least 3cm above the floor
g
1. Place the outdoor unit on the
support.
2. Fix the foot holes of outdoor unit
with bolts.
73
foot holes
foot holes

Hide quick links:

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Asg0918wiAsg1218wiAsg1818wi

Tabla de contenido