1.
Lay gate components on a smooth, at and clean
surface. Begin by arranging the rails in the correct
orientations.
2.
For Styles With Two Rails:
a. Slide the pickets/boards into the bottom rail. If
pickets/boards are numbered, follow the sequence
from left to right (Fig. 1).
b. Slide the top rail over the pickets (Fig. 2).
For Styles With Three Rails:
a. Slide the pickets/boards into the bottom rail. If
pickets/boards are numbered, follow the sequence
from left to right (Fig. 1).
b. Slide the middle rail over the pickets/boards.
c. Slide the top rail over the pickets/boards (Fig. 2).
3.
a. Apply provided vinyl cement to all inside surfaces of
the uprights where the rails will be installed (Fig. 3).
b. Attach uprights to rails (Fig. 4).
1
Pickets
Bottom Rail
Vinyl Cement
Vinyl Cement
Upright
Assembly
Fig. 1
Fig. 2
Fig. 3
Fig. 4
5