Connecting The Power To The Unit; Cabling Requirements - Ingeteam INGEREV CITY Ground Manual De Instalacion Y Uso

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Ingeteam

7.2.3. Connecting the power to the unit

Cabling requirements

The connection must meet certain requirements:
Connection specifications
Connection type
Number of conductors
Nominal current
Conductor maximum diameter
Connection process
1.
With the back enclosure still open, check the battery connection (red cable to positive, blue cable to
negative).
24
Single phase
2P + E
up to 32 A
10 mm
(2 x 6 mm
2
Battery
ABA2020IQM01_B - Installation and Operation Manual
Installing and connecting the unit
Three phase
3P + N + E
up to 32 A
)
2

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Ingerev city duo

Tabla de contenido