Kohler Devonshire K-394 Guia De Instalacion página 9

Griferia de lavabo con centros a 8"
Ocultar thumbs Ver también para Devonshire K-394:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Supply Tube
6. Supply Tube and Supply Stop Connections
- Install the lavatory using the lavatory manufacturer's instructions.
- Connect the supply tubes to the handle bodies and supply stops. (Left
is hot - right is cold).
- Tighten all connections.
7. Installation Checkout
- Connect the P trap.
- Ensure that all connections are tight.
- Remove aerator by turning it counterclockwise.
- Open the drain.
- Turn on main water supply and check for leaks. Repair as needed.
- Open both hot and cold valves and run water through the spout for
about a minute to remove debris. Check for leaks. Turn valves off.
- Remove any debris from aerator and reinstall.
Kohler Co.
Supply Tube
9
Spout
Aerator
A
1012739-2-

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Devonshire k-394m

Tabla de contenido