Unscrew the screw (Z) fully out of the foot.
Press the foot with the pin and the O-rings on it into the hole in the heating bath base plate as far as the stop.
Tighten the screw (Z) by hand.
• Place the heating bath on the stand of the rotation drive and push it into the left position.
Assembling the stand pillar RV8.1
No stand is required if the condenser has been properly fitted and secured by tightening the condenser union
nut on the rotary drive.
The purpose of the stand is solely to prevent the condenser twisting.
Caution: If the RV8.1 stand is fitted incorrectly, the strong
forces at the Velcro strap can cause stresses within the
glass, which in turn can cause damage to the glass
condenser.
After the condenser has been fitted, the RV8.1 stand is
attached to the rotary drive. Make sure that the condenser is
installed parallel to the lift body.
- Guide the stand rod through the hole on the underside of
the rotary drive,
- Screw the knurled screw into the tapped hole but do not
tighten it,
- Move the stand until the upper rubber sleeve rests
against the glass condenser,
- Tighten the knurled screw finger-tight,
- Secure the condenser to the stand using the pre-fitted
Velcro strap.
20