Networking The Pdu - Tripp-Lite PDUMH20HVNET El Manual Del Propietario

Ocultar thumbs Ver también para PDUMH20HVNET:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation
2-3
Equipment Power Cord Connection:
Insert the IEC C14 connectors
equipment power cords into the PDU's
IEC C13 output receptacles
near each output receptacle
C
illuminates when the receptacle is ready
to distribute live AC power. The digital
load meter
connected equipment load in amps.
2-4
Optional Cord Retention Procedure:
Use the included C14 sleeves to secure
plugs to receptacles. Attach the sleeve to
the plug, making sure that the pull tabs
remain outside the plug and that the
A
fit is secure. To unplug equipment
properly, use the pull tabs to remove the
plug and sleeve from the receptacle.

Networking the PDU

For network configuration instructions, please refer to the WEBCARDLX owner's manual (PN
93358E) included with this product.
18-11-320-933681.indb 5
of the
A
. The LED
B
will display the total
D
A
2-3
A
2-4
5
B
15
D
C
1/25/2019 2:54:58 PM

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Agpd6684

Tabla de contenido