Cequent Performance Products 30095 Instrucciones De Instalación página 13

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Read pages 1-3 of these instructions before starting installation. Failure to do so could result in significant vehicle damage!
IMPORTANT NOTES FOR THIS INSTALLATION:
1.
Find parallel rows of bed sill spot welds in bed of truck. No drilling should be done in the approximately 4" between
parallel rows of spot welds where the bed sill sets.
Front of Vehicle
Fifth wheel hitches over
18k must have a center
bolt in the center hole in
both rails.
Note: Place center bolt in
the hole that does not
interfere with the bed sill. If
needed, flip the rail around.
Center bolts and hardware
are supplied with Fifth
wheel or gooseneck
hitches that are rated over
18k.
Hitch center approximately 3" ahead
of axle center.
Front of
Vehicle
Straight bracket
1/4
1.5-3
*
1/4
2
Check for obstructions before drilling. Failure to do so could result in damaged fuel or brake lines, structural members, etc.
Cequent Performance Products, Inc. does its best to communicate tow vehicle manufacturer changes; however, it is ultimately
30095N 6/13/14 REV. K
DODGE THROUGH 93 (FULL SIZE)
Note: Pull wire provided, will be needed to install
hardware in brackets through frame.
CAUTION!
the responsibility of the installer to prevent damage due to installation.
©2014 Cequent Performance Products, Inc.
CAUTION!
Axle center
Bed Sill
Rear Edge of
Truck Bed
Long bed &
Short bed
32"
Measure from Rear Edge of
truck bed to rear edge of
base rail.
Left, right angle and frame
brackets maybe place where
ever brackets fits best.
Drivers side of 1/2 ton Ram Shown
Angled bracket
* Optional weld
pattern
1/4
2
*
1/4
2
PRINTED IN CHINA
13

Publicidad

Tabla de contenido
loading

Tabla de contenido