Read pages 1-3 of these instructions before starting installation. Failure to do so could result in significant vehicle damage!
IMPORTANT NOTES FOR THIS INSTALLATION:
1.
Find parallel rows of bed sill spot welds in bed of truck. No drilling should be done in the approximately 4" between parallel
rows of spot welds where the bed sill sets.
Front of Vehicle
Fifth wheel hitches over
18k must have a center
bolt in the center hole in
both rails.
Note: Place center bolt in
the hole that does not
interfere with the bed sill. If
needed, flip the rail around.
Center bolts and hardware
are supplied with Fifth
wheel or gooseneck
hitches that are rated over
18k.
Front of
Vehicle
STRAIGHT
BRACKET
1/4
2
*
1/4
2
Check for obstructions before drilling. Failure to do so could result in damaged fuel or brake lines, structural members, etc. Cequent
Performance Products, Inc. does its best to communicate tow vehicle manufacturer changes; however, it is ultimately the responsibility of the
30095N 6/13/14 REV. K
1992-2004 FORD F-250 & F-350 SHORT & LONG BED
Axle Center
Note: Pull wire provided, will be needed to install
hardware in brackets through frame.
installer to prevent damage due to installation.
©2014 Cequent Performance Products, Inc.
CAUTION!
King Pin Center approx. 1/2" rearward of
Axle Center
CAUTION!
Measure from Rear Edge of
truck bed to rear edge of base
rail.
Rear Edge of
Truck Bed
30 3/16" Long Bed
and Short Bed
Bed Sill
Drivers side of F350 Super Duty
long bed Shown
1/4
2
1/4
2
* Optional weld pattern
PRINTED IN CHINA
Angled bracket
*
15