Grundfos Control MP 204 Instrucciones De Operación Y Instalación página 7

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 20
Terminal block for pump alarm, X11
X11
32 33 343 3 37
Pump run Fault, MP 204 Fault, water shortage
Fig. 6
Terminal block for pump alarm, X11
Connection
Description
32-33
Pump run, 2 A
34-35
Fault, MP 204, 2 A
36-37
Fault, water shortage, 2 A
5
6
Terminal block for pressure switch or level switch, X10
X10
1 2 3 4
X10
1
2
3
4
Cross-bridge
isolated
Remote On/Off
2
4
1
B1
P
Minimum and
maximum pressure
switch
Fig. 7
Terminal block for pressure switch or level switch, X10
Connection
Description
1-2
Ground connection
3-4
Pressure or level switch
PE1
Ground connection
Water-shortage supervision.
5-6
Pressure or level switch.
If not used, a cross-bridge is mounted.
PE2
Ground connection
All cables used for control signals from analog and
digital sensors must be screened to ensure stable
and correct function.
5 6
PE1
PE2
PE1
5
6
PE2
Cross-bridge isolated
Water-shortage
supervision
2
4
1
PE
PE
B2
P
Example:
Water-shortage
pressure switch
2
4
1
PE
B2
Example:
Level switch
7

Publicidad

Tabla de contenido
loading

Tabla de contenido