f Refer to chapter "Activating ground monitoring"
on page 39.
Deactivating ground monitoring
Fig. 11: Key sequence for deactivating ground monitoring
b The
button lights up red.
CHARGE STATUS
b The
indicator light and the
DOMESTIC
indicator light light up red.
b Ground monitoring has interrupted the charging
process or prevents it from starting.
1. Press and hold the
CHARGE STATUS
-
simultaneously.
MULTI
FUNCTION BUTTON
The
indicator light flashes white when
CHARGER
you do so.
2. As soon as the
indicator light stops
CHARGER
flashing, release both buttons.
3. After 2 seconds (count the time as soon as the
flashing stops), press and hold both buttons
again simultaneously for at least 5 seconds.
The
indicator light flashes white when
CHARGER
you do so.
Ground monitoring is deactivated when the
indicator light and the
DOMESTIC CONNECTION
indicator light light up yellow. During
VEHICLE
charging, the
CHARGE STATUS
button additionally
pulses green.
Monitoring remains deactivated for subsequent
charging processes.
Information
For easier operation of the charger, your fingers
should cover the buttons completely and apply even
pressure.
Activating ground monitoring
If the charger is operated in an earthed mains supply
system, activate ground monitoring.
e Press and hold the
-
the
MULTI
FUNCTION BUTTON
at least 5 seconds.
The
indicator light flashes white when
CHARGER
VEHICLE
you do so.
Ground monitoring can be activated via the web
application:
f For information on the web application, see the
button and
manual at https://www.porsche.com/interna-
tional/aboutporsche/e-performance/help-and-
contact/
If you require a different language, please select
the appropriate website for your country.
Energy Manager
The energy manager coordinates the energy
consumers and energy suppliers in the household.
For charging control to be assumed by the energy
manager, the charger and energy manager must be
connected to one another via a Powerline Communi-
cation (PLC) network connection. For this purpose,
the existing mains supply is used to set up a local
network for data transfer.
Adding the energy manager
There are two options for connecting the energy
manager to a PLC network:
– The energy manager is registered as a client in
a PLC network (application variant 3).
– Direct PLC communication between the charger
f For information on application variants, refer to
The connection between the charger and energy
manager is established directly from the charger and
in the web application of the energy manager.
Establishing a Connection to the
button and
CHARGE STATUS
simultaneously for
Charger
The
status of the connection to the PLC network and to
the energy manager.
PLC/energy manager connection status indicator
Status
indicator
Pulsing yellow
Flashing
yellow
Operating Manual
and energy manager (DHCP server) (application
variant 4)
chapter "Possible Uses" on page 31.
indicator light shows the
ENERGY MANAGER
Meaning
Status 1
The charger attempts to re-estab-
lish the previously used PLC
connection (maximum duration:
60 seconds).
e Optional:
Press and hold
-
the
MULTI
FUNCTION BUTTON
for 3 seconds to skip re-
connection.
The charger then searches for
a new PLC network.
Status 2
The charger attempts to establish
a connection to the new PLC
network (maximum duration:
9 minutes).
DE
EN
FR
IT
ES
PT
NL
SV
FI
DA
NO
EL
CZ
HU
PL
HR
SR
SK
SL
ET
LT
LV
RO
BG
MK
39