ensure that the packing is intact and that it does not display readily apparent damage;
only remove the packaging when the cabinet is located in the area of use
carefully perform the unpacking operation in order to avoid damaging the cabinet;
check the integrity of the cabinet components;
where any damage is discovered, immediately contact the manufacturer
gently remove the protective film and remove the adhesive residue with appropriate
solvents
perform initial cleaning with neutral products, dry with a soft cloth
ATTENTION! Discarded packing parts. Injury.
Do not leave packing parts (nails, wood, staples, etc.) and tools used for the operation
(pliers, scissors, etc.) in the working area.
These objects must be removed with appropriate means and taken to their respective
collection places.
i
For correct disposal
The packaging consists of: wood - polystyrene - polythene - PVC - cardboard.
13. Installation and environmental conditions
WARNING!
Before carrying out any operation take all possible precautions to prevent injury to the
operator, use the individual Personal Protection Equipment provided (cap.3.)
Installation is restricted to trained and authorised technicians by the body named in
the contract (manufacturer/dealer/distributor)
i
It is the customer's responsibility to prepare the installation area
Changes to the installation described must be authorised by ARNEG S.p.A.
The area of
comply with the standards in force in the country of installation
installation
respect the environmental climate class (cap.9.)
must
ensure the floor is able to support the weight of the cabinet
there must be a switch with automatic protection against short-circuits,
ground shock and dispersions between the mains supply and the cabinet
provide the necessary space for use and maintenance
Environment
For the cabinet to work properly, the room temperature and relative humidity
must not exceed the limits of a climate class 3 (+25°C; R.H. 60%) according to
al conditions
the standard EN-ISO 23953 - 2.
Installation
Step
procedure
1
2
3
4
5
6
install up to three cabinets in channel on the same electrical and
refrigeration supply line (1 master + 2 slaves)
before connecting the cabinet to the electrical line, ensure that the rating
plate data matches the characteristics of the electrical system to which the
cabinet must be attached.
If the cabinet is moved, repeat the levelling test,
incorrect levelling may undermine operation of the cabinet
level the cabinet
05060154 00 26/05/2014
carefully examine the installation area, eliminating any danger to the
operator;
remove the fixing screws of the wooden frame (Fig. 11)
remove the wooden frame
mount the adjustable feet (Fig. 10)
adjust the feet to a maximum height of 25 mm (Fig. 10)
adjust the horizontal position of the cabinet using a spirit level (Fig. 9)
Colonia 3 - Mini Colonia
Action
English
37