Airwell AW-CFV09/07-N11 Manual De Usuario E Instalacion página 12

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 112
Installation Procedures
4. Hoisting Stud Installation
• To support the weight of the unit, use barb bolts in the situation with the ceiling. In the situation with the new ceiling, use
inlaid bolts, embedded bolts or other parts provided on site. Before proceeding the installation, adjust the gap between
the bolts and the ceiling.
• Use four M10 hoisting studs (provided on site) (when the height of the hoisting stud exceeds 0.9m, M10 studs should be
used.). The gaps should be kept according to the overall drawing of the air conditioner. Make the installation according
to regulations for various building structures as to ensure the safety. Use the level meter to perform the parallel
installation.
Ceiling Suspending
Situation with New Ceiling
(1) Install the indoor unit temporarily:
attach the hoisting foot to hoisting stud. Make sure that nuts and washers should be used at two ends of the foot to
secure the foot.
(2) For the size of the ceiling hole, please refer to the schematic drawing at the previous page.
<After finishing the installation of the ceiling>
(3) Adjust the unit to the proper installation location.
(4) Check if the unit is in the horizontal level:
The indoor unit is equipped with a built-in drainage pump and a floater switch.
Check if the 4 angles of the unit are in the horizontal level with the water level
or the polythene tube with water, as shown in the figure,taking only one indoor
unit as an example. If the unit inclines opposite to the direction of condensate
flow, the floater switch might have faults, causing water dropping.
(5) Tighten the nut on the washer.
Situation with Original Ceiling
(1) Install the indoor unit temporarily: attach the hoisting foot to
hoisting stud. Make sure that
nuts and washers (provided on site) should be used at two ends
of the foot to secure the foot.
(2) Adjust the height and location of the unit.
(3) Perform Step 4 and 5 in Situation with New Ceiling.
Preparation of Decorated Board
• Don't put the decorated board downward to the floor. Putting it against the wall or on the extrusive objects is not
allowed.
• Don't touch the wind deflector or apply force on it, or the wind deflector will have faults.
water level
nut (provided on site)
washer
tightening (dual nuts)
[secure hoisting foot]
9
polythene tube
washer
hoisting foot
[secure washer foot]

Publicidad

Tabla de contenido
loading

Tabla de contenido