Complete the Valve Installation (cont.)
If the valve has stops, rotate both stop adjustments fully
clockwise.
Turn the valve control "On", and note that water does not run.
Turn the valve control "Off", and rotate both stop adjustments
fully counterclockwise.
Reinstall the plaster guard.
114542-2-BC
12
Kohler Co.